CLIENT & LOCATION |
NATURE OF WORKED / SERVICES |
DATE |
VARIOUS NDT CO,
Batam, Indonesia |
Level III Service |
December 2010 |
MASTER MARINE,
Tanjung Uncang, Batam, Indonesia |
Supply of UT Cross g Checker of Crane pedestal |
January 2010 |
METAPHIL ABOITIZ,
Cebu, Philipines |
Supply of PCN Qualified Cross Checker |
April 2011 |
CITRA ENGINEERING,
Kabil, Batam Indonesia |
Supply of UT & MT Cross Checker of Gorgon Project |
May 2011 |
SOUTH CHINA INSPECTION TESTING SERVICES,
Batam, Indonesia |
Supply of NDT PCN Qualified Technician |
June 2011 |
CAHAYA FORTUNA ABADI,
Batam, Indonesia |
Supply of Qualified Level II UT Technician |
June 2011 |
PT. SPEKTRA MEGAH SEMESTA Surabaya Indonesia |
Supply of PCN Qualified NDT Technician |
March 2011 |
PT. SPEKTRA MEGAH SEMESTA. Tomohon Sulawesi |
Supply of PCN Qualified NDT Technician |
February 2012 |
VARIOUS SHIPYARDS Batam, Indonesia |
NDT, Personel Equipments and Consumables |
March 2012 |
KARAI 13 HYDRO POWER Simalungun, Medan |
Supply Radiography, Inspector of Dimension Control Testing Technician & Equipment |
June 2012 |
ALSTOM POWER ENERGI Surabaya, Indonesia |
NDT INSPECTION & SERVICE (Lin Kow Project) |
August 2012 |
PT. PAL Surabaya, Indonesia |
NDT INSPECTION & SERVICE |
March 2013 |
PT. HANSA ENGINEERING INDONESIA Tanjung Uncang, Kepri, Indonesia |
NDT INSPECTION Collaborate with A-Star Taining & Consultancy to conduct PAUT, MT and UT in GE Varous Project |
November 2013 |
PT. SINGATAC BINTAN INDONESIA Bintan, Kepri, Indonesia |
NDT INSPECTION & SERVICE |
June 2014 |
PTSC VIETNAM |
Level III Service (TOTAL MAHARAJA SOUTH LELA Project) |
October 2014 |
Siemens - Wens Quality Insurance (s) Batu Ampar - Batam |
Dimensional Controlle for yamal LNG Project |
June 2015 |
PT. Toba Pulp Lestari Porsea - Sumut |
Power Plant Project, PAUT services for boiler tube |
December 2015 |
Mc. Connell Dowel Batam |
Post Weld Heat Treatment/Test ( PWHT ) Wheatstone LNG Project |
February 2016 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Phased Array Ultrasonic Testing (PAUT) for Power plant boiler project RB#3 and PB#02 Shutdown Maintanance |
March 2016 |
PT. KPI Bontang - Kaltim |
Turn around/shutdown project for IRIS, RFT, PAUT, Boroscope, Thickness measurement, Penetrant Testing, Radiography Testing |
March 2016 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Boroscope for Turbine Maintanance TG#5 Shutdown |
April 2016 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Boroscope for Turbine Maintanance TG#6 Shutdown |
October 2016 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Ultrasonic Testing for Inlet Pipe Steam TG#6 Shutdown |
December 2016 |
PT. Mitra Karya Sarana (MKS) |
Magnetic Particle Testing for OSD Fitting Pipe |
December 2016 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Dye Penetrant Testing and Phased Array Ultrasonic Testing for Power Plant Boiler PB#2 Shutdown |
February 2017 |
PT. Louis Alain |
Magnetic Penetrant Testing for Over Head Crane |
March 2017 |
PT. Mc Connell Dowell Indonesia |
Magnetic Particle testing, Dye Penetrant Testing and Ultrasonic Testing Amrun Project |
January 2017 - May 2017 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Dye Penetrant Testing for Power Plant Boiler PB#3 Shutdown |
May 2017 |
PT. Riau Andalan Pulp and Paper (RAPP) |
Dye Penetrant Testing for Recovery Boiler RB#2 Shutdown |
June 2017 |
PT. Louis Alain |
Conventional and Advance NDT services for various project |
January 2017 - present |
PT. Mc Connell Dowell Indonesia |
Conventional and Advance NDT services for various project |
January 2017 - present |
PT. Riau Andalan Pulp and Paper (RAPP) |
Conventional and Advance NDT services for various project |
January 2017 - present |